Office Build-Out Checklist: From Lease Signing to Opening Day

Tenant improvements run on tight timelines. A step-by-step checklist to coordinate the landlord, permits, trades and inspections without losing your opening date.

Every commercial build-out has a fixed point on the calendar: the day your team or your customers walk in. Working backward from that date is the best way to keep a project under control.

Before you sign the lease

  • Walk the space with your contractor to identify demolition, MEP and accessibility needs
  • Review the landlord's work letter and tenant improvement allowance
  • Ask for existing drawings of the suite and the building systems

Design and permitting

  • Finalize the layout and finish selections early — changes during construction are the biggest schedule risk
  • Coordinate engineering for HVAC, electrical and plumbing as needed
  • Submit for permit; plan review time varies by city, so build it into the schedule

Construction

  • Demolition and rough-ins, followed by inspections
  • Framing, glass partitions, ceilings and lighting
  • Flooring, paint and finishes
  • Low-voltage, furniture and IT coordination with your vendors

Close-out

  • Final inspections and certificate requirements
  • Punch list walkthrough
  • Handover of warranties and documentation

One team, one schedule